Select the application rate needed to leach minerals from the particular ore you are using. Selecting an application rate will help determine the correct T-Tape emitter spacing and flow rate for your operation.
APPLICATION RATES
Gallons per minute per square foot
24 INCHES BETWEEN LATERALS
Emitter spacing (inches)
Emitter GPH
12
18
24
30
36
0.50
0.0042
0.0028
0.0021
0.0017
0.0014
1.00
0.0083
0.0056
0.0042
0.0033
0.0028
2.00
0.0167
0.0111
0.0083
0.0067
0.0056
30 INCHES BETWEEN LATERALS
Emitter spacing (inches)
Emitter GPH
12
18
24
30
36
0.50
0.0033
0.0022
0.0017
0.0013
0.0011
1.00
0.0067
0.0044
0.0033
0.0027
0.0022
2.00
0.0133
0.0089
0.0067
0.0053
0.0044
36 INCHES BETWEEN LATERALS
Emitter spacing (inches)
Emitter GPH
12
18
24
30
36
0.50
0.0028
0.0019
0.0014
0.0011
0.0009
1.00
0.0056
0.0037
0.0028
0.0022
0.0019
2.00
0.0111
0.0074
0.0056
0.0044
0.0037
Liters per hour per square meter
60 CM BETWEEN LATERALS
Emitter spacing (cm)
Emitter LPH
30
45
60
76
91
1.9
10.56
7.04
5.28
4.17
3.48
3.8
21.11
14.07
10.56
8.33
6.96
7.6
42.22
28.15
21.11
16.67
13.92
76 CM BETWEEN LATERALS
Emitter spacing (cm)
Emitter LPH
30
45
60
76
91
1.9
8.33
5.56
4.17
3.29
2.75
3.8
16.67
11.11
8.33
6.58
5.49
7.6
33.33
22.22
16.67
13.16
10.99
91 CM BETWEEN LATERALS
Emitter spacing (cm)
Emitter LPH
30
45
60
76
91
1.9
6.96
4.64
3.48
2.75
2.29
3.8
13.92
9.28
6.96
5.49
4.59
7.6
27.84
18.56
13.92
10.99
9.18